Lý Hồng Lập 1981 0
Giới thiệu về ứng viên
CURRICULUM VITAE (CV)
1. Proposed :
Site Manager
Position
2. Name of Firm :
Công Ty TNHH OS POWER Việt Nam
3. Name of Expert :
LY HONG LAP
4. Date of Birth :
02/06/1981 Nationality:
Vietnamese
5.
Education
:
:
– Danang University – Road and Bridge Department; Date attended:
1999; Degrees obtained:
Highway Engineer 2004
– Hanoi Transport University – 2010 to 2012; Degree obtained:
Master of
Engineering (Highway & Urban Road Construction)
6. Membership of :
– Member of the Vietnam Highway and Bridge Society – Da Nang City
Professional Division
Associations – Member of the Vietnam Society of Soil Mechanic and Geotechnical
Engineering
7. Other Training:
– Certification for Professional Supervision Consultant Engineer (Highway
& Urban Road Construction, level 1), expires 2018-2023
– Certification for Professional project management Consultant Engineer
(Civil & Industry, level 1), expires 2018-2023
– Certification for Professional Supervision Consultant Engineer (bridges,
roads), at Da Nang Construction Department, year 25/06/2015; expires
25/06/2020.
– Certification for Professional Designer for traffic project design (bridges,
roads), at Da Nang Construction Department, year 25/06/2015; expires
25/06/2020.
– Professional training course for investment project management at Ha
Noi Institute of Cadre Training and Improvement DTB, year 18/12/2009.
– Advanced training courses in “Design, Construction and Inspection for
bored piles foundation and underground works”, at VietNam Society for
Soil Mechanics & Geotechnical Engineering, year 30/07/2011.
– Certification for H.S.E, at Center of Industrial Safety Registration Zone
III, year 13/12/2015; expires 13/12/2020.
8. Countries of :
Vietnam
Work
Experience
9. Languages:
Speaking Reading Writing
– Vietnamese:
Mother tongue Mother tongue Mother tongue
– English:
Fair Fair Fair
10. Employment Record:
Duration Employer Position held
From:
May.2018 to Artelia Viet Nam Company Position held:
Infrastructure Design
Present Senior
From:
May.2014 to APAVE Asia-Pacific Company Position held:
Tunnel Engineer at
Mar.2018 Ca Pass tunnel Project
1
Chief of Department
From:
Apr.2011 – BK Engineering and Construction Position held:
Manager of
May.2014 Company Technical & Technology
Department
From:
Mar. 2008 – Tin Nghia Transport Engineering Position held:
Deputy Manager of
Apr. 2011 Consulting Joint Stock Company Technical Department
(CCQC)
From:
Aug. 2004 – Transport Engineering Consulting Position held:
Highway Engineer
May 2008 Joint Stock Company No5
(TECCO5)
11. Detailed Tasks Assigned:
[blank, fill later for specific project] [[List all tasks to be performed
under this assignment]
–
12. Work undertaken that Best Illustrates Capacity to Handle the Task Assigned:
(13) Name of Project :
Vam Co Dong Township
Source of Funds :
Private Funds
Year :
Aug 2019 – present
Location :
Long An province
Client :
Nam Long Group
Main Project features:
The overall project has a planning scale of up to 355ha, including low-
rise housing areas (townhouses, villas), high-rise (apartments) and utility works such as office
complexes, shopping, services, entertainment, hospitals,
education
and sports complexes, etc.
In particular, the land area for building villas is 11 hectares, townhouses and apartments are
37.5 hectares, business area – 15ha of service area, 67.5ha of entertainment area, 19ha of hi-
tech park, …
– Total investment of phase 1 (165ha):
VND 7000 billion
Position held :
Infrastructure Design manager
Activities
performed:
– Reviewing design documents.
– Monitoring construction quality on site.
– Representing Client, working with designer, examiner, construction contractor to
ensure the quality of design documents.
– Assisting Project Director, project manager in interacting with the Project Owner, Contractor,
and other relevant partners.
(12) Name of Project :
Hoa Phat Factary and Port Facility (HPF)
Source of Funds :
Private Funds
Year :
Apr 2018 – present
Location :
Quang Ngai province
Client :
Hoa Phat Group
Main Project features:
Project description:
Area about 350 hectares, 1 Steel Mil Factory
complex and 1 Maritime port for Ship from 5000 to 250000 DWT ( including berth,
embankment, protection, dredging).
The project has a total investment of 2.5 billion USD
Position held :
Infrastructure Engineer
Activities
performed:
Construction Supervision Consultant for Road, ditch, culvert, regulatory lake, retaining
2
wall, foundation structure,…and Shop drawing review
(11) Name of Project :
Cu Mong Pass Road Tunnel project
Source of Funds :
Private Funds
Year :
Oct 2015 – present
Location :
Binh Dinh – Phu Yen province
Client :
Deo Ca Investment Joint Stock Company
Main Project features:
Project construction investment through Cu Mong Pass Tunnel on
route 1A through Binh Dinh and Phu Yen, beginning at Km 1239 + 500 – 1A Binh Dinh
province, end at Km 1247 + 500 in the province of Phu Yen. In particular, Cu Mong Pass tunnel
length is 2.600m, access road and bridges on the road 2km.
The project has a total investment of 4000 billion VND
Position held :
Highway Engineer
Activities
performed:
– Inspection for construction of Approach road and Portal tunnel
– Checking shop drawing and acceptantce on site
– Review detail design
– Participation for create quality control process, H.S.E; outline of Supervision
Consultant, Inspection sheet form of tunnel, bridge, road.
(10) Name of Project :
Ca Pas Road Tunnel project
Source of Funds :
Private funds
Year :
April 2014- Sep 2015
Location :
Phu Yen – Khanh Hoa province
Client :
Deo Ca Investment Joint Stock Company
Main Project :
Project construction investment through Ca Pass Tunnel on route 1A
features:
through Phu Yen and Khanh Hoa, beginning at Km 1353 + 500 – 1A Phu
Yen province, end at Km 1374 + 525 in the province of Khanh Hoa. In
particular, Ca Pass tunnel length is 3.900m, Co Ma Pass tunnel length of
500m, access road and bridges on the road 9km.
The project has a total investment of 15 603 billion VND
Position held :
Tunnel Engineer
Activities
performed:
– Inspection for construction of Co Ma tunnel
– Checking shop drawing and acceptantce on site
– Review detail design
– Participation for create quality control process, H.S.E; outline of Supervision
Consultant, Inspection sheet form of tunnel, bridge, road.
(9) Name of Project :
Nga Ba Hue Flyover
Source of Funds :
Private funds
Year :
Feb.2014 to May 2014
Location :
Da Nang City
Client :
Nga Ba Hue Trung Nam L.td Co.
Main Project features:
This interchange is more floors. Ground floor with frontage roads
system, Level 1 is the roundabout with diverters, 2nd floor is the main structural bridge include
hollow concrete girders and tower cable-stayed span symmetry.
Total investment for the project is 1957 billion
3
Position held :
Highway Engineer
Activities
performed:
– Inspection for construction of Approach Road
– Checking shop drawing and acceptantce on site
– Review detail design
– Participation for create Quality Control Process, H.S.E; outline of Supervision
Consultant, Inspection sheet form of bridge, road.
(8) Name of Project :
Environmental Remediation at Da Nang Airport
Source of Funds :
ODA
Year :
Feb/2013 to Feb/2014
Location :
Da Nang City
Client :
United State Agency for International Development (USAID)
Main Project Construction of In-Pile Thermal Desorption structure (IPTD) with
features:
dimension 105x70x7.5m, using ~ 30,000 CMU blocks (1,300 x 660 x
660) for containment wall, ~ 6,000 m3 of lightweight insulated concrete
and 15,000 m2 of HDPE membrane. Clearance and removal of 200,000
m2 of vegetation and excavation and transportation approximately
80,000 m3 of contaminated soil/sediment to IPTD for treatment. Thermal
treatment of the 80,000 m3 of contaminated soils including site
restoration after completion of the Project.
Position held :
Shop drawings design manager
Activities
performed:
Responsible for detailed design of earthwork, retaining wall by CMU
block, Mechanically stabilized earth walls, dewatering and drainage, lightweight insulating
concrete slab at floor and wall, steel sheet wall and traffic safety including stabilization
calculation, structure and quantity calculation.
(7) Name of Project :
Tran Thi Ly Bridge
Source of Funds :
Govement funds
Year :
Nov/2012 to feb/2013
Location :
Da Nang City
Client :
Da Nang Department of Transport
Main Project features:
Continuous span bridge with a total length of about 731 m from
abutment to abutment S1 S13. The bridge is arranged as follows:
• 4 spans open of main bridge of the west from abutment S1 to pier S5 (50 meters per span)
with a total length of 200m
• The main span (span cable-stayed) from pier S5 to pier S6 with a total length of 230 meters
• Seven spans last of approach bridge of the east from pier S6 to pier S7 (span 45 m), from
pier S7 to pier S13 (each span 50m), from pier S11 to pier S12 (spans 28.8 m), from pier S12
to pier S13 (span 27.2m), with a total length of 301m spans. The total width of the bridge is
35.5m
Project value:
1,700 billion VND
Position held :
Highway Engineer
Activities
performed:
– Inspection for construction of Approach Road
– Checking shop drawing and acceptantce on site
– Review detail design
– Participation for create Quality Control Process, H.S.E; outline of Supervision
Consultant, Inspection sheet form of bridge, road.
(6) Name of Project :
The new urban Doi Che, Ha Long, Quang Ninh Project (Scale
80Ha)
4
Source of Funds :
Private funds
Year :
from 4/2011 to 11/2012
Location :
Quang Ninh province
Client :
Quang Ninh youth enterprise joint stock company
Main Project The Project” design the infrastructure for new urban Đoi Che, Ha Long,
features:
Quang Ninh with total quantity of mechanically stabilized earth wall
(MSE) of 7,000m long
Position held :
Project Manager
Activities
Responsible for detailed design of infrastructure components for urban
performed:
road, retaining wall and traffic safety including stabilization calculation,
structure and quantity calculation.
(5) Name of Project :
Nha Trang – Phan Thiet Expressway Project
Source of Funds :
ODA
Year :
July 2009 to April 2011
Location :
Nha Trang, Ninh Thuan province
Client :
Ministry of Transport, Vietnam
Main Project The project for construction of expressway connecting from Nha Trang
features:
to Phan Thiet, Km150 +00 – Km170 +00
Position held :
Design Team Leader
Activities
Responsible for design of highway, retaining wall and traffic safety
performed:
including stabilization calculation, structure and quantity calculation.
Directly contact with local authorities on all
activities
related to the
Project.
(4) Name of Project :
Upgrade National highway No.1 Project
Source of Funds :
ODA
Year :
October 2008 to July 2009
Location :
Binh Thuan – Ninh Thuan Province
Client :
Ministry of Transport
Main Project The project for National road of 50km long, road width B=11m
features:
Position held :
Project manager
Activities
Responsible for design including:
Drainage Plan and
Profile
, Details of
performed:
Culvert, interchange, Quantity calculation…Directly contact with local
authorities on all
activities
related to the Project.
(3) Name of Project :
National highway No.48 Project
Source of Funds :
ODA
Year :
May 2008 to October 2008
Location :
Nghe An province
Client :
PMU 18
Main Project The project for National road of 80km long, road width B=11m
features:
Position held :
Road Engineer
Activities
Responsible for design including:
Drainage Plan and
Profile
, Details of
performed:
Culvert, interchange, Quantity calculation… Directly contact with local
authorities on all
activities
related to the Project
(2) Name of Project :
Ha Noi – Hai Phong Expressway Project
5
Source of Funds :
Private funds
Year :
May 2005 to May 2007
Location :
Ha Noi, Hai Phong province
Client :
Ministry of Transport
Main Project Main project features:
Class A Expressway, total length of 105km
features:
Position held :
Road Design Engineer
Activities
performed:
Get involved in road design, traffic organization for Ha Noi-Hai Phong
Highway
(1) Name of Project :
The road of Hai Van – Tuy Loan Tunel South Project
Source of funds :
ODA
Year :
August 2004 to May 2005
Location :
Da Nang City
Client :
PMU 85
Main Project National Highway Grade II, total length of 10km
features:
Position held :
Highway Engineer
Activities
performed:
Get involved in road design, traffic organization, design the flexible
pavement structure in accordance with 22TCN 274-01 (ASSHTO) by the self-prepared
calculation sheets using Visual basic 6.0 for The road of Hai Van – Tuy Loan Tunel South
Project
13. Certification (For World Bank CVs Form only)
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
describes myself, my qualifications, and my
experience
. I understand that any wilful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
LY HONG LAP Date:
[Signature of staff member or authorized representative of the staff] Day/Month/Year
Full name of authorized representative:
13. Contact :
Residential Address K8/11 Phần Lăng 8, Tổ 79 – An Khê – Thanh Khê – Đà
Detail (For Nẵng
ADB CVs form Tel:
Email:
only)
14. Certification (For ADB CVs form only)
I, the undersigned, certify to the best of my knowledge and belief− Yes No
(i) t(h is CV correctly describes my qualifications and my
experience
(ii) I am employed by the Executing or the Implementing Agency.
(iii) I am a close relative of a current ADB staff member.
(iv) I am the spouse of a current ADB staff member.
(v) I am former ADB staff member
6
· If yes, I retired from ADB over 12 months ago
(vi) I am part of the team who wrote the terms of reference for this consulting
services assignment.
(vii) I am sanctioned (ineligible for ADB engagement).
I understand that any willful misstatement described herein may lead to my disqualification or
dismissal, if engaged
LY HONG LAP Date:
12/10/2019
[Signature of expert] Day/Month/Year
Full name of authorized representative:
13. Certification (For AFD CVs form only)
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe
me, my qualifications, and my
experience
.
LY HONG LAP Date:
[Signature of staff member and authorized representative of the firm] Day/Month/Year
Full name of staff member:
______________________________________
Full name of authorized representative:
___________________________
7