Giới thiệu về ứng viên

PHAN MINH TIEN
Engineering Manager – 4 years’

experience
Date of birth:
July 1992
Nationality:
Vietnamese
Mobile, Zalo, WhatsApp:
+ 4879
Email:
Education
Background
– Bachelor of Civil Engineer (Sep 2010 – June 2015)
DUYTAN University, Da Nang, Viet Nam.
Work

Experience
China Construction Engineering (S.E.A) Malaysia Sbn. Bhd.
Position:
Engineering Manager (June 2019 – Present)
The Rise Residence & Resort, luxury condo hotel project at Melaka Malaysia.
Phase 1A with Block B 43 floors, Block C 529 floor.
Total units:
1,158
Project value:
RM 288,798,000.00
– Leading and build up Engineering Department with 6 staffs at new project.
– Set up facilities at new project follow logistic plan such as office, worker quarter,
temporary road, dumping area, perimeter fence, entrance, public road traffic, electric,
water, canteen, tower crane piling,…
– Mobilize worker, material, machineries for structure works.
– Expedite subcontractor achieve progress and ensure integrity of quality.
– Prepare & adjust progress schedule follow actual progress at site.
– Report to Construction Manager, Project Manager regarding progress, material,
manpower.
– Coordinating between Engineer Department to other such as Technical, QAQC, Safety,
Equipment, MEP, Material Department.
– Directly liaise, discuss to client regarding progress, technical issues and method
statement at site.
Position:
Site Engineer (Jan 2017 – June 2019)
Seremban Pr1ma, apartment project at Seremban City, Negeri Sembilan, Malaysia.
8 Block 25 floors
Total units:
1,504
Proposed project site area:
48,562 m2
– Managed structure (from foundation to roof) and overall architect works of 2 Buildings
25 floors.
– Determining and prevent any hazards which likelihood of an accident occurring.
– Control, supervise and support sub-contractor to finish structure, MEP, architect works
properly, achieve target and comply with safety requirements.
– Distribute, manage logistic at site to ensure safety, working purpose.
– Liaise, coordinate between supplier (e.g. concrete, rebar, mobile crane, machineries,
hardener, material..) and sub-contractor, safety, MEP, structure, surveyor, operator,
workers to make work smoothly and avoid any obstructions.
– Checking and processing inspection before work start.
– Determine and correct the mistakes of drawing, worker to make sure project delivered
with good quality.
– Consult to manager the solution, method that meet the requirements of safety, integrity
of quality and progress.
– Make sure structure, architect works were completed follow standard required in the
contract.
– Determine, predict and give out the solution to minimum any mistakes, double work,
double cost during construct project.
– Report status and progress at site to chief engineer, engineer manager.
– Ensure works at site were done follow correct sequence.
– Deal with subcontractor, supplier about unpredicted scope of works.
– Lead a team 2 civil engineer to manage, supervise architect works.
Position:
Technical Engineer (Sep 2016 – Jan 2017)
– Checking faults, integrity, shop all drawing if necessary to support construction works
and feedback immediately any discrepancies to consultant to prevent any delay of
work.
– Design, calculating, issue drawing method statement for construction and for
professional endorsement application e.g. scaffolding, formwork, transfer slab support
system, cantilever scaffolding, back prop, external scaffolding, temporary staircase,..
– Cooperate with main contractor regarding drawings, details, method statement,
requirements, and schedules.
– Support and clarify to sub-contractor about technical, method, materials, and expedite
progress base on MIP plan.
RFR Phap Viet Co., Ltd
Position:
Civil Engineer (Aug 2015 – Sept)
– Developed, planed structure solution based on architect drawings in high-rise building
field.
– Manage, draw and check all drawings of project.
– Analysis result of survey and testing.
– Study and research new technology, method statement to improve the design.
– Co-operating, teamwork among MEP, architect, structure to minimize discrepancies
and ensure integrity of design.
– Meeting with client and other trade to ensure smoothly progress of documents and
design.
– Write, programing software, excel VBA to support work which stage have to repeat
with many steps to find out optimization results.
Project:
– Rosana Complex:
48 Xuan Thuy Street, District 1, HCMC, Vietnam.
Architect :
Vo Trong Nghia Co., Ltd.
Height :
39m with 12 Stories.
+ Provide the most sensible solution of structure to make sure integrity of architect,
coordinate with Japanese architects.
+ Design, manage all drawings of structure in basic design stage.
– IDB Vietnam Complex:
19/298 Ngoc Lam, District Long Bien, Ha Noi, Vietnam.
Architect :
Tuan & A Architects.
Height :
68.85m
Design post-tension slab in the technical design phase.
– Majetstic 3 Nha Trang:
98A Tran Phu Street, Nha Trang City, Khanh Hoa, Vietnam.
Architect:
Architect & Construction 5D
Total height:
89.95m
+ Provide the solution and design for foundation, underground structure system.
Achievements
– 2015 The 2nd prize, Silver medal – LOA THANH:
The award was organize by Vietnam
Ministry of Construction, Vietnam Construction Association, Vietnam Architect
Association, and the Ho Chi Minh Communist Young Union to award annually for
outstanding thesis of student in the field of construction and architect Vietnam.
– 2015 Success in scientific research with the subject “Programing software to design
reinforcement concrete column according to TCVN 5574:
2012 and shear wall ACI
318”.
– Honored as outstanding staff 2017 of China Construction Engineering (S.E.A) Malaysia
Sbn. Bhd.

Skills
– Good at engineering software e.g. AutoCAD, CSI ETABS, Sap2000, SAFE, Autodesk
Revit and office software:
Excel, Word, Power point…
– Calculate, design structure both manual and software for high-rise building, apartment,
and single element.
– Searching, analysis and acquainted with new information, knowledge quickly.
– Have

experience
of teamwork and manage to get the best result.
– Working under high pressure, ensure works meet the deadline.
– Good skill of planning, analyzing and translate drawing to construction phase, willing to
work under high pressure.
– Good at verbal and reading English, especial is Technical English.
– Self-motivation.
– Dealing and arranging work follow correct procedure and standard in term of
construction.
Language
Vietnamese – Fluent
English – Good
Mandarin – Basic
Bahasa Malaysia – Basic

Hãy là người đầu tiên đánh giá “PHAN MINH TIẾN”

Đánh giá của bạn cho danh sách này