Giới thiệu về ứng viên

Construction Management, Project Management, Civil Engineering, Site Supervision, Quality Assurance, Team Leadership, Contract Management, Safety Compliance, Cost Estimation, AutoCAD, Revit, MS Project …

Nguyen Quoc Minh/ Construction Manager
CURRICULUM VITAE (CV)

I. Personal Details:
– Surname:
NGUYEN QUOC MINH
– Date of birth:
08th April, 1984
– Place of birth:
Quynh Dy Ward, Hoang Mai Town, Nghe An Province.
– Address:
Thoai Ngoc Hau Street, Hoa Thanh Ward, Tan Phu District, HCMC.
– Passport Number:
B7764684
– Mobile:
– Email:
– Sex:
Male.
– Married status:
Married.
– Health:
Good
– Hobby:
Football & traveling
– Desired position:
Civil & Construction Engineer.
– Expecting working place:
Follow your instruction.
– Expected salary:
Negotiated

II. Education:
– Sep/2004 – Dec/2008:
Graduated from Ha Noi University of Civil Engineering, Vietnam, major in Port & Waterway Engineer.
– Certificate of English, level B of Jupiter Scientific English Centre year 2012.
– Certificate of professional training Supervision from Ha Noi University of Civil Engineering Viet Nam.
– Certificate of Construction Supervision.
– Certificate of Project Management.
– Certificate of Ms Project.
– Bidding and cost estimating course.
– PTW (permit to work), Safety course…

III. Special Skill:
– Software Skills:
– AutoCAD
– Revit
– Microsoft Office
– Estimate
– MS Project
– Language:
– Speaking: Good
– Reading: Good
– Writing: Good
– Good knowledge of Vietnamese and International Technical specification as ASTM, ACI, BS, JS, AASHTO…
– Working Skills:
– Team-working
– Creative thinking
– Organization
– Training skills to resolve problems in office and site work.
– Communication Skill:
– Familiar with both Office and Site works, can create good relationships with clients, investors, supervisors, and subcontractors.
– Fast learning capacity, enjoy working under pressure, can be on travel duty if required.
– Problem solving and analytical skills.
– Self-confident, truthful, trustworthy and ambitious.
– Able to work in a group and independently under pressure.

IV. Employment History:
1) From May 2021 to Aug 2023:
– Company:
Japfa
– Position:
Construction Manager (Client)
– Project:
Feed Mill Factory Project
– Location:
Ben Luc Dist-Long An Province.
Japfa is a leading corporation in food, feed, farm, and business in the world. In Vietnam, Japfa has upgraded the capacity of existing factories and built new some factories and farms. At the same time, I am in charge as project manager for 2, and 3 new and expansion factory projects with CSA and MEPF packages.
– I presided over the work of mounting a project management plan.
– I am joining deciding contractor with the head of the division, I am also in charge of recruiting the below staff, conducting the preparation of ground organization, and construction and M&E work for the factory, infrastructure, and utility house…
– I also participated in the survey group on topography, geology, and hydrology for the project area, design management team, project legal documents, concept design, and technical design.
– By repeating the project management plan at the construction site, I also joined the project management team, project development team, design team, and investment planning team. Thereby, I have almost grasped the process of operating, managing, and developing projects from the first steps to handover and commercial run.
– I held the overall project site team responsible for the work as below: overall progress control/schedule/safety/quality/coordination.
– And I reported directly to the project director and head of the division.

2) From Mar 2019 to Apr 2021:
– Company:
Royal HaskoningDHV
– Position:
Senior CSA Supervisor (Consultant)
– Project:
Germadept – Terminal Link Cai Mep Terminal.
– Location:
Phuoc Hoa Commune-Phu My Town-Ba Ria Vung Tau Province.
Duties included:
– Checking and approval submissions from the Contractor, including Schedule, QA/QC plan, and inspection formats, ITP (inspection and test plan), SD (shop drawing), MS (method settlement), and MAR (material approval request).
– Attend, witness, and monitor input material before construction on site, especially material for shell core and finishing work, including spun pile, concrete, reinforcement steel bar, steel structure, bolt connection, brick, mortar, tile, granite stone, epoxy, waterproofing, paint, gypsum, partition, timber and aluminum window and door, aluminum composite panel and glass, cladding, roof sheet…
– Carry out inspection of a variety of work on-site including Civil, Structural, and Architectural items following ITP, SD, and MS approval.
– Check and monitor the quality and progress of the project, ensuring the requirements of the contract.
– Push contractor to catch up on proposal schedule and keep up the quality and safety condition.
– Attending regular weekly and coordination meetings with the client, contractors, and other involved parties, reviewing and distributing of minutes of these meetings by contractors.
– Understand the principles and importance of planning. Monitor and track daily progress and work completed, comparing the plan to actual. Takes appropriate mitigating action to ensure compliance with the plan, based on knowledge of available manpower, equipment, and materials.
– Review of Variation Orders from Contractor and discuss and seek approval from the Client.
– Review the contractor’s progress claim and issue the Payment Certificate, as well as keep track of the progress of payments.
– Weekly and monthly progress reporting.
– Discussion with and assistance to the contractors in the preparation of long-term and short-term execution planning schedules, and closely monitoring of the progress achieved by the contractors.
– In case of delay or potential delay, methods shall be devised to prevent such delays or if necessary, to catch up on already lost time.

3) From Jun 2014 to Dec 2018:
– Company:
SW
– Position:
Site Manager & QS office (Main contractor)
– Project:
SW Ho Chi Minh Main Office (from Oct 2017 to Dec 2018)
– Location:
Dist 7-HCMC.
– Project:
Hyosung Factory Project (from Nov 2016 to Oct 2017)
– Location:
Nhon Trach 5 I.P-Nhon Trach Dist-Dong Nai Province.
– Project:
Dae Myung Factory Project (from Dec 2015 to Nov 2016)
– Location:
Sonadezi Long Thanh I.P-Long Thanh Dist-Dong Nai Province.
– Project:
Chemtrovina Factory Project (from Feb 2015 to Dec 2015)
– Location:
Nhon Trach II-Loc Khang I.P-Nhon Trach Dist-Dong Nai Province.
– Project:
Lock & Lock Domitory (from May 2014 to Feb 2015)
– Location:
My Xuan-Tan Thanh Dist-Ba Ria Vung Tau Province.
Duties included:
– Manage, Control direct worker and sub-contractor to setting out, driving pile work, Foundation, Column, Slab and Roof of 4th floor Dormitory.
– Manage, Control all the activities of the Sub Contractor on the site (Main shop foundation work, steel structure work, guard house, pump house, waster zone…).
– Manage, Control civil work (Soil and sand backfilling, aggregate, asphalt concrete, concrete way, drainage system, and landscape work…).
– Manage, Control the finishing work (Waterproofing, tiles, epoxy, brickwork, plastering and painting, glass wood panel, aluminum panel, glass, door, window, ceiling work, and toilet partition…).
– To discuss with the design company and site manager about the drawing.
– QS office and QS site work.
– To contact and discuss with the sub-contractor about the method statement to keep the schedule.
– To contact the supplier and request some material (concrete, steel, soil and sand backfill, aggregate, asphalt concrete, brick, and tile…).
– Checking material quality before submitting to consultant and client.
– To discuss with the site manager and had an office about the payment, material, some relationship with industrial zone and government…
– Make monthly payments and submit them to the client.
– Checking all subcontractors, and supplier monthly payments and making proposal payments submitted to site manager and head office.
– Instruction and checking completion document and As-Built drawing before submitting to government.
– Coordinate with relevant departments to carry out the tender for new projects.

4) From Apr 2012 to May 2014:
– Company:
Toa-Toyo Joint Venture.
– Position:
Site Engineer (Main Contractor)
– Project:
Cai Mep International Container Terminal – ODA Port.
– Location:
Cai Mep industrial area– Tan Thanh district– Vung Tau province.
Duties included:
– Make detail shop drawing and make construction method of work items.
– Making progress and management in accordance with the work schedule.
– Direct working on the site, supervising and controlling the activities of the sub-contractor.
– Control the Yard Pavement (Subgrade, Sub-base, CBM (cement bound materials), and paving asphalt concrete, laying interlocking concrete blocks (ICB)).
– Control the Concrete, rebar, and formwork (Container base, runway RTG, concrete way…).
– Control Civil work (Water tank, Manhole, Storm waterway, and wastewater way system).
– To discuss with the site manager and the client about progress and coordinate construction equipment.

5) From Dec 2008 to Mar 2012:
– Company:
Portcoast Consultant Corporation
– Position:
Site Supervisor (Consultant)
– Project:
Sai Gon International Terminal Viet Nam (SITV)
– Location:
Phu My 1 industrial area– Tan Thanh district– Vung Tau province.
– Project:
SP-SSA International Terminal (SSIT)
– Location:
Phuoc Hoa- Tan Thanh district- Ba Ria Vung Tau Province.
Duties included:
– Inspection, monitoring, and appreciate schedule of construction on the Site. Updated information on the daily site record.
– Monitoring work performance in accordance with schedule and plan.
– Reminders and suspend the detected violations, technical regulations, quality, and safety works as designed and approved method.
– Checking of design and make detail shop drawings for work items.
– Inspection piling work.
– Inspection Subgrade, Sub-base, CDM, CBM (cement bound materials), Asphalt concrete works for Pavement works.
– Inspection of Concrete, rebar, and formwork of container base, runway RTG, and concrete way.
– Inspection of the electric station, pump house, administration building, workshop, and technical infrastructure in the Port.
– Make completion document and As-Built drawing.