Kỹ sư thiết kế cơ khí chuyên về tự động hóa và phát triển sản phẩm. | Nam | 1991 | Quận 9 – Hồ Chí Minh
Giới thiệu về ứng viên
Mechanical Design Engineer, Automation Technology, 3D Modeling, Product Development, Technical Improvement, Manufacturing Line, Process Optimization, Team Collaboration, Safety System, Quality Control, Problem Solving, Technical Training …
EDUCATION
2009-2015 Ho Chi Minh City University of Technology and Education
– Major: Automation Technology
EXPERIENCE
July 2018 – Now
Nidec Servo Corporation
– Position: Mechanical Design Engineer
– Solve Day-to-Day Production, Equipment, and Process Problems
– Analyze Manufacturing Line, Suggest the Innovation Idea
– Research and Develop New Products
– Design 3D Models for Automation Machine, Automation Manufacturing Line
– Export 2D, Material BOM, Assembly Drawings
– Making Materials and Equipment Prices
– Responsible for the Operating Time of Production and Technical Improvement Equipment as Required
– Follow Up the Maintenance & Improvement Researching Activities
– Technical Training for Technicians
Oct 2016 – June 2018
Foster Electric Vietnam
– Position: Mechanical Design Engineer
– Solve Day-to-Day Production, Equipment, and Process Problems
– Research and Develop Product Quality
– Control Safety, Environment & Quality System
– Collaborate with Relevant Departments to Solve Technical Problems
– Responsible for the Operating Time of Production and Technical Improvement Equipment as Required
SKILLS
– Design 3D Models for Automation Machine, Automation Manufacturing Line
– Microsoft Office
– English
– AutoCAD
– SolidWorks, Inventor
– Prepared Monthly Reports for Senior Managers and Update the Project File to Deploy
– Follow Up the Maintenance & Improvement Researching Activities
AWARDS
– 2017 – Award Given for “Innovation Idea Competition” at Foster Electric Vietnam
ACTIVITIES
– 2017 Create Template SolidWorks, Inventor for Department
– 2013 Green Summer Volunteer Campaign
PROJECT EXPERIENCE
STT Project Name Content Effectivity
1. Press Connector Machine
– Design 3D Model
– Export 2D, Material List
– Assembly
– Adjust
– Cut Down 2 Workers
– Investment Cost: $7,500
– Return Cost Time: 7.5 Months
2. Press Magnet Machine
– Design 3D Model for New Production Code from Current Line
– Change Jig to be Suitable with New Code
– Adjust the Accuracy When Run Automatedly
– Cut Down 1.5 Workers
– Investment Cost: $3,000
– Return Cost Time: 2 Months
3. Input MAT-H Machine
– Design 3D Model
– Export 2D, Material List
– Export Assembly Drawings
– Assembly
– Adjust and Follow
– Cut Down 1 Worker
– Investment: $10,000
– Return Time: 20 Months
4. PMD V2 Line Automation Line
– Design 3 Units in Full
– Export 2D
– Assembly and Follow
– Cut Down 4 Workers
– Investment: $90,000
– Return Time: 18 Months