Giới thiệu về ứng viên

Quản lý sản xuất, Kỹ thuật cơ khí, Tối ưu hóa quy trình, Quản lý dự án, Thiết kế kỹ thuật, Bảo trì thiết bị …

EDUCATION
– Sep 2017 – Apr 2019
– HCMC University of Economics
– Major: Executive MBA
– Expected 7/2019 graduation, is doing the final thesis
– Sep 2005 – May 2010
– HCMC University of Technology
– Major: Thermal Engineering – Mechanical Engineering
– Hoang Nguyen Viet Graduation grade, average grade 7.43

WORK EXPERIENCE
– Jul 2011 – Dec 2018
– FiCO Cement Plant
– Deputy Production Manager and Assistant Director
– Management of mechanical equipment within the workshop
– Monitoring the operation status of machinery and equipment
– Coordinate with relevant departments to plan regular maintenance – overhaul to ensure keep equipment in a state of readiness for continuous production
– Consultant – Director of Factory for mechanical engineering
– In charge of deployment of items Improved – rationalize – optimize the experience, skills and knowledge of equipment in the production line

– May 2010 – Jul 2011
– Hoa Lan Trading Service
– Technical Supervisor – Deputy Commander
– Supervisor and Deputy Commander of the Central Building of the University of Technical Education
– Participate in the design, disassemble mass for HVAC works such as PEPSI.CO, Ba Ria Vung Tau General Hospital, VRG River View

SKILLS
– MS Office
– AutoCAD

ACHIEVEMENT HIGHLIGHTS
– Mar 2013 – Jul 2013
– Improvement of ball mill Liners
– General description: The technological characteristics of the old Liners are not suitable. The requirement is to improve the technological characteristics of the lining
– Results: Optimizing the technological characteristics of crusher Liners, improving Grinding capacity of about 18%, and increasing the service life of the liner more than 3 times before

– Dec 2013 – Feb 2014
– Design – Installation of suspended winches for waterway cement export system
– General description: The structure of the original winch uses a single cable to hang and lift the winch
– Results: New cables run simultaneously with the main system is very stable, improving safety for people and equipment

– Apr 2015 – Jun 2015
– Design – Installation of cement withdrawal system PCB50 Line II
– General description: It is necessary to have an additional cement export system to reduce the pressure in the process of exporting goods
– Results: Increase flexibility in the operation of equipment for export of PCB50 cement products

– Oct 2017 – May 2018
– Renovating equipment in the production line of Grinding area
– General description: The project is implemented including 3 major items
– Results: Overcoming the weaknesses of the system, optimizing and contributing to improving equipment efficiency and reducing new investment costs for equipment

CERTIFICATIONS
– Certificate of management skills – middle management – Excellent 2016
– Certificate of professional bidding – Excellent 2015
– Certificate of construction supervision – Excellent 2015
– Certificate in 3D mechanical graphic design – Excellent 2012

HONORS & AWARDS
– Excellent Party Member 2017
– Merit of Ministry of Construction 2014
– Competitor – FiCO Cement Plant 2013, 2014, 2015, 2016, 2017
– 12 Outstanding Faces – FiCO Cement Plant 2014, 2015, 2016, 2017

PARTY WORK – UNIONS
– Had held the positions of Deputy Secretary of the Youth Union; Union vice president; Member of the Executive Committee of the Branch