Nguyễn Vũ Mạnh 2009
Giới thiệu về ứng viên
Nguyen Vu Manh
1. PR. OPOSED POSITION :
QS Manager / QA-QC Manager / Project Manager
2. NA ME OF FIRM :
3. NA. ME OF STAFF :
Nguyen Vu Manh
4. DA. TE OF BIRTH :
25-Feb-1981 NATIONALITY :
Vietnamese
5. AD DRESS :
Hai Chau District – Da Nang City – Viet Nam
6. TE LEPHONE :
7. EM AIL :
8. SK YPE NAME :
nguyenvumanhtecco5
9. ED6U CATION :
Engineer of Bridge and Road Construction, Da Nang Polytechnic
University, 2004
Bachelor of Business Administration, Danang University of
Economics, Vietnam, 2015
10. ME. MBERSHIP OF :
Member of the Bridge & Road Association of Danang City-Vietnam
PROFESSIONAL ASSOCIATIONS
11. OT. HER TRAINING :
– Professional Certificate for Transport Construction Engineering,
DaNang Construction Department, 2011
– Certificate of Procurement Skill Training Course, 2011
– Certificate of Project Management Training Course, 2011
– Certificate of Project Manager Training Course, 2011
– Certificate of Project Management Professional Training Course,
2019
– Professional Certificate for Transport Construction Supervision,
Tuyen Quang Construction Department, 2016
– Certificate of Cost Estimator, Da Nang Construction Department,
2012
12. CO UNTRIES OF WORK :
Vietnam
EXPERIENCE
13. LA NGUAGES :
LANGUAGE SPEAKING READING WRITING
English Good Good Good
Japanese Fair Fair Fair
Vietnamese Mother tongue
14. EM PLOYMENT RECORD :
FROM:
July 2016 TO:
Present
EMPLOYER :
Lotte Engineering & Construction Co., Ltd
POSITION HELD :
QS Manager
FROM:
Jan 2014 TO:
June 2016
EMPLOYER :
Cienco 5 BOT – Branch of Civil Engineering Construction Corporation No. 5
POSITION HELD :
Vice Chief of Technical Department
FROM:
Dec 2011 TO:
Dec 2013
EMPLOYER :
Nippon Koei Co., Ltd
POSITION HELD :
Highway Engineer, Road Safety Audit Engineer
FROM:
Aug 2004 TO:
Dec 2011
EMPLOYER :
Transport Engineering Consulting Joint Stock Co. No.5 (TECCO5)
POSITION HELD :
Chief Designer, Vice Chief Designer, Highway Engineer, Drainage Engineer
1. Name of Danang – Quang Ngai Expressway Development Project,
Understand the Fidic Contract
assignment Package A4 (Km110+100 – Km124+700), Construction
Calculate & compare volume or project:
Supervision
between confirmed at the site
Year:
7/2016 – Present
and design shop drawings
Location:
Quang Ngai provinces
Make variation order
document for the additional Client/Funds:
Vietnam Expressway Corporation (VEC) / Co-financed by
quantity and arising item after JICA and WB
Page 1 of 20
Nguyen Vu Manh
project Main project
Road Length:
L=14.60 km;
features:
Check & monitor
Road Classification:
Expressway:
Type A, Class 120;
Subcontractor’s IPC
Design Speed:
Expressway:
120 km/h;
Monitoring the construction
progress of the Contractor Nos. of Lane:
4 lanes (Ultimate stage:
Widened to 6
lanes);
Managing, supervising
technical aspect and Road With:
Expressway:
Road and Bridge sections:
24.25
construction quality m;
Reviewing quality assurance Design Frequency:
Expressway:
1 %;
documentation
Bridge:
8 bridges, including Other River Bridge, Stream
Monitoring, controlling and Bridge, Canal Bridge, Viaduct, Overpass, Interchange
signing the monthly and final Rampway Bridge and Flyover;
Payment
Certificates
.
Interchange:
1 interchanges.
Preparing report for project
manager Position held:
Quantity Surveyor Manager
Activities
performed:
Designing
projects
of highway Monitor & keep track of project progress
, designing road plans,
Assist the construction team to inspect all quantity and
longitudinal
profile
s, cross
inspection records
sections, intersection, grading
plan, designing drainage Calculate & compare volume between confirmed at the
system, designing road site and design shop drawings
structure and roadway slope
Calculate the quantity based on the shop drawings and
protection structures such as
follow-up until they were delivered to site construction
pavement, orown ditch, side
ditch, retaining wall, MSE Recheck all Interim Payment Certificate (IPC) before
wall, slope protection method, submitting to the leader
softsoil treatment. designing
road safety system and road Prepare for all variation quantity at site
operation system.
Make variation order document for the additional quantity
Slope stability analysis, and arising item after project
treatment for deep cutting Contact and collect quotations from suppliers
and high embankment area.
Prepare detailed cost plans
Preparing design calculations
through Excel software for Prepare all payment plans
calculation and recalculation
Check & monitor Subcontractor’s IPC
of load bearing capacity,
stability of structures and 2. Name of
National Highway No.1 Widening Investment Project, Section
works items of bridge and assignment
goes through Quang Nam province, Construction Supervision
highway in compliance with or project:
the structure analysis
Year:
1/2014 – 6/2016
methods and standards for
design of Vietnam and the US Location:
Phu Ninh & Nui Thanh District, Quang Nam Province
(AASHTO).
Client/Funds:
Cienco5 – BOT
Using some software Main project
Road length:
28.2km
programes such as Civil 3D, features:
Softdesk, Nova TDN, Road classification:
Class III, Delta (Secondary Urban
Vnroad,… for designing road Road)
and Geo Slope, Geo 5 for
calculation of stability of Design speed:
80km/hr (60km/hr)
structures or iterms Nos. of lane:
4 lanes
interacting with ground such
as shallow footing, pile Road width:
20.5m (25.5m)
foundation, retaining wall,
Design Frequency:
4%
road foundation stability, road
slope stability, tunnel… Bridge:
6 bridges
Proficient in the following
Road pavement:
High class A1
programs Autocad, MS word,
Position held:
Vice Chief of Technical Department
Page 2 of 20
Nguyen Vu Manh
MS Excel,…
Activities
performed:
Coordinate, check, control design team in progress,
Being responsible for inner quality design
review of design reports
Monitoring the construction progress of the Contractor
before they are submitted to
the Quality Control Managing, supervising technical aspect and construction
Department. quality (especially for AC construction)
Being present at site together Checking, approving materials, structural components,
with the Employer, method statements
Supervision Consultant,
Coordinate with the engineer on quality related issues
Contractors to handle some
technical problems related to Taking part in the acceptance process
the design during the course
of construction, Giving Identify and record any problems relating works on the
opinions to the department site and discuss with design consultant to find solution for
problems
and the Company’s Leaders
for handling any structure Control and stop any works of non-conforming
construction failures. issues/matters until deficiency or unsatisfactory condition
has been corrected
Checking the Bill of
Quantities for construction in Supervise construction team, engineer and report to
order to ensure its accuracy project manager
and not exceed the quantities
approved in the engineering Reviewing quality assurance documentation
design step. Certifying the
Reviewing and approving the monthly payment, IPC, final
materials haulage distances
payment certificate
to be a basis for preparation
of unit prices in the cost Implement a non conformity report system
estimate and final payment.
Prepare progress and quality control reports for project
Reviewing and accepting the
manager
contractor’s construction
methods, and construction
Experience
s to work with MOT, State Audit, …
organization designs.
3. Name of
Danang – Quang Ngai Expressway Development Project,
Verifying the qualification of assignment
Detailed Design
the Sub-Constructors or project:
selected and recommended
Year:
12/2011 – 12/2013
by the main contractors, the
qualification of the Main Location:
Da Nang city, Quang Nam and Quang Ngai provinces
Contractors compaired with
Client/Funds:
Vietnam Expressway Corporation (VEC) / Co-financed by
his previous proposals and
JICA and WB but Detailed Design by WB Funding
with the contract agreement
between the Employer and Main project Road Length:
L=139.52 km;
the Main Contractors for features:
release of reports to the Road Classification:
Expressway:
Type A, Class 120,
Employer. Linking Road:
Class III, Delta;
Measuring, checking the Design Speed:
Expressway:
120 km/hr (Tunnel section:
realistic conditions at 100 km/hr), Linking Road:
80 km/hr;
construction site before
Nos. of Lane:
4 lanes (Ultimate stage:
Widened to 6
commencement of project or
lanes);
its works items.
Road With:
Expressway:
Road and Bridge sections:
25.50
Checking the quality, type of
m, Tunnel section:
m=25.5 m, Linking Road:
materials and prefabricated
12.0 m;
components to be used for
project, equipment and Design Frequency:
Expressway:
1 %, Linking Road:
4 %;
machines for construction.
Bridge:
131 bridges, including Large River Bridge, Other
Checking the quality
River Bridge, Stream Bridge, Canal Bridge, Viaduct,
management system of the
Overpass, Interchange Rampway Bridge and Flyover;
contractors.
Major River Bridge:
4 bridges, including Ky Lam Bridge,
Checking the site
Chiem Son Bridge, Tra Bong Bridge, Tra Khuc Bridge;
laboratories, materials &
components production Tunnel:
1 tunnel (Km022+900, L=2@540 m);
plants, asphalt concrete
Interchange:
9 interchanges;
mixing plants, concrete
batching plants prior to Position held:
Highway Engineer, Road Safety Audit Engineer
Page 3 of 20
Nguyen Vu Manh
construction.
Activities
performed:
Designing alignment, plan,
profile
, cross section of
Supervising work at the expressway, crossing road, frontage road, parking area
construction site in order that and service area
all works items will be done
Designing pavement structure, intersection, grading plan
with the highest quality, in line
and road structure
with the schedule of the
project, in compliance with Slope stability analysis, treatment for deep cutting and
the working drawings, high embankment area
technical specifications of the
Designing mechanically stabilized earth wall
project or standards,
specifications, codes issued Designing traffic signal
by the state.
Calculating and summarizing quantitites
Supervising for sampling at
the construction site, 4. Name of
Arterial highway of Southern Ha Tay Province Project,
supervising field tests and assignment
Construction Supervision
laboratory tests, suggesting or project:
additional tests or requesting
Year:
2010 – 2011
for subtitution of non-
comforming materials Location:
Hanoi City
Client/Funds:
Cienco5 Land
Checking the working safety
measures, construction safety Main project The
objective
of the project is to construct 41.5 km road, from
conditions, checking features:
Ha Dong City to NH No.1 (Km214+320) in Ha Noi City.
measures for precaution of Design speed 60km/h, total width of cross section is 40.00m,
fire & explosion and for asphalt concrete pavement.
ensuring environmental
Position held:
Highway Engineer
sanitation.
Activities
performed:
Responsible for reviewing Contractors’ construction plans,
Measuring and accepting
work schedule, method statements, equipment and facilities.
construction work, witness
Checking, approving materials, structural components, Issue
points or hold points, or entire
all necessary instruction to the contractor, on behalf of client,
project before putting into
ensuring all the works comply with the approved contract
operation.
documents.
Managing, supervising technical aspect and construction
quality.
Monitoring the construction progress of the Contractor.
Reviewing and approving the monthly payment.
5. Name of
Ha Noi – Hai Phong Expressway Project, Construction
assignment
Supervision
or project:
Year:
2009 – 2010
Location:
Hanoi, Hai Phong Cities
Client/Funds:
VIDIFI
Main project The
objective
of the project is to construct 105 km
features:
Expressway, from Ring road 3 IC (Km0+000) to Dinh Vu IC
(Km105+000) in Ha Noi and Hai Phong City, Hung Yen and
Hai Duong province. Design speed 120km/h, total width of
cross section is 33.00m, asphalt concrete pavement.
Position held:
Highway Engineer
Page 4 of 20
Nguyen Vu Manh
Activities
performed:
Review construction plan, shop drawing, method statement
before submitting to the Employer for getting approval.
Issue all necessary instruction to the contractor.
Controlling, monitoring and recording highway work
activities
.
Control and guide Inspector’s
activities
on site, inspection and
testing procedure.
Identify and record any problems/issues relating works on the
site, find solution for problems/issues occurred on the site.
Monitor/control/stop any works of non-conforming
issues/matters until deficiency or unsatisfactory condition has
been corrected.
Review and sign inspection documents, testing results
submitted by contractor/laboratories.
Ensure that all materials and construction are in accordance
with the requirements for the completeness, accuracy,
constructability in compliance to Employer’s requirement.
6. Name of National Highway No. 24 connecting section from Quang Ngai
assignment Province to Kon Tum Province (Km8-Km165), Detailed
or project:
Design
Year:
2009
Location:
Quang Ngai Province and Kon Tum Province
Client/Funds:
VRA
Main project This is the important traffic route to connect the provinces in
features:
the Western Highlands towards Southern Central Region and
towards the sea. The construction investment in widening,
upgrading of the route will contribute to the perfection of traffic
road network, to meet the travel demands in the area,
creating the driving force to speed up the socioeconomic
development of Quang Ngai, Kon Tum Provinces and the
surroundings, contributing to the economic development and
integration of the area, strengthening economic, political
relationships & exchanges between Vietnam and the
countries in the east-west economic corridor. The total length
of route :
144Km; Design speed:
60Km/h; Width of road
embankment :
9m; Width of road pavement:
6m; High-class
A1 road pavement. Using cement concrete road pavement on
cement consolidated crushed stone aggregate base layer for
sections bypassing the passes & having great slopes.
Position held:
Vice Chief Designer, Highway Engineer, Drainage Engineer
Activities
performed:
Taking part in the process of route direction location,
designing the
profile
and the cross section of route, designing
the road embankment & pavement of the route and structures
on the route. Responsible to the design head for the
undertakings.
Responsible for designing of the box culvert, pipe culvert, side
drainage system.
Monitoring, checking, controling the progess and quality
design.
7. Name of
Component No.I Project Section:
Song Truong – Tra Bong –
assignment
Binh Long, Construction Supervision
or project:
Year:
2008
Location:
Binh Son District – Quang Ngai Province
Client/Funds:
Quang Ngai PDOT
Main project Length of the route:
7.551,56m , Class IV road in
features:
mountainous area; Width of road embankment :
7,5m; BST
crushed stone road pavement Eyc=980daN/cm2
Position held:
Site Inspector
Page 5 of 20
Nguyen Vu Manh
Activities
performed:
Being in charge of site supervision. Responsible for
reviewing Contractors’ construction plans, work schedule,
method statements, equipment and facilities, day to day
supervision of construction
activities
to ensure quality
assurance and control, verification of setting out for road
and structural works, conducting pre-work measurements
by taking cross sections, carrying out measurements of
quantities of executed works, verification of bill of quantities
for payment, supervision of routine tests on earthwork and
pavement layers as per required specifications, inspection
of project progress and control of cost, maintaining records
pertaining to the project, ensuring labour safety during
construction, environmental impact, and preparation of
monthly and other project progress reports.
8. Name of
Ha Noi – Thai Nguyen Expressway Project (ODA), Detailed
assignment
Design
or project:
Year:
2007
Location:
Hanoi, Thai Nguyen Cities
Client/Funds:
PMU 18
Main project The
objective
of the project is to construct 63 km
features:
Expressway, from Ninh Hiep IC (Km0+000) to Thai nguyen
(Km63+000) in Ha Noi and Thai Nguyen City. Design speed
120km/h, total width of cross section is 34.50m, asphalt
concrete pavement.
Position held:
Interchange Specialist
Activities
performed:
Responsible for designing of interchanges, intersection and
drainage section.
9. Name of
Dung Quat – Sa Huynh Coastal Road Project, Feasibility
assignment
Study
or project:
Year:
2007
Location:
Binh Son District – Quang Ngai Province
Client/Funds:
Quang Ngai PDOT
Main project The
objective
of the project is to construct the route running
features:
along the sea, great significance is connecting the coastal
roads of Quang Nam, Binh Dinh Provinces to form the
coastal longitudinal artery, associating the main point
economic zones in the coastal areas of the Central Region,
contributing to the socioeconomic development of the
coastal areas, raising the people’s lives, strengthening the
national defence security and protecting the environment.
Length of the route:
87,942km; Design speed:
80Km/h,
Width of road pavement:
11m, high-class A1 road pavement
structure.
Position held:
Highway Engineer, Drainage Engineer
Activities
performed:
Taking part in the process of route direction location,
designing the
profile
and the cross section of route,
designing the road embankment & pavement of the route
and structures on the route. Responsible to the design head
for the undertakings.
Responsible for designing of the box culvert, pipe culvert,
side drainage system.
10. Name of Component Project No.II Section:
Binh Long – Dung Quat
assignment Port, Working Drawing Design
or project:
Year:
2006
Location:
Binh Tri Village, Binh Thuan – Quang Ngai Province
Page 6 of 20
Nguyen Vu Manh
Client/Funds:
The investment
projects
MU of Quang Ngai Province
Main project The project is class I road in plain; Design speed:
120Km/h;
features:
Width of road pavement:
33,5m with 6 driving lanes; High-
class A1 road pavement.
Position held:
Highway Engineer, Drainage Engineer
Activities
performed:
Taking part in the process of route direction location,
designing the
profile
and the cross section of route,
designing the road embankment & pavement of the route
and structures on the route. Responsible to the design head
for the undertakings.
Responsible for designing of the box culvert, pipe culvert,
side drainage system.
11. Name of
Cho Bong – Son Tho Traffic Road under MPRR Project in
assignment
Ha Tinh Province, Detailed Design
or project:
Year:
2004 – 2005
Location:
Vu Quang District – Ha Tinh Province
Client/Funds:
Ha Tinh MPRP PMU
Main project The
objective
of the project is to speed up economic
features:
activities
, eliminating hunger and reducing poverty and
strengthening the accessibility to
education
al, health
services for the peoples of Vu Quang District via the
reduction of time of travelling, transport charges/costs and
strengthening the exchanges, trades in agricultural/farm
produces among the villages in the district and the
surroundings.
Position held:
Highway Engineer, Drainage Engineer
Activities
performed:
Taking part in the process of route direction location,
designing the
profile
and the cross section of route,
designing the road embankment & pavement of the route
and structures on the route. Responsible to the design head
for the undertakings.
Responsible for designing of the box culvert, pipe culvert,
side drainage system.
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications,
and my
experience
. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal,
if engaged.
DATE:
01 July 2019
[Signature of staff member or authorized representative of the staff] Day Month Year
Full name of authorized representative:
Page 7 of 20
Nguyen Vu Manh
Bachelor of Science in Civil Engineering
Bằng tốt nghiệp đại học
Page 8 of 20
Nguyen Vu Manh
The Degree of Bachelor in Business Administration
Bằng cử nhân ngành Quản trị kinh doanh
Page 9 of 20
Nguyen Vu Manh
Professional Certificate for Transport Construction Engineering
Chứng chỉ
hành nghề kỹ sư
Page 10 of 20
Nguyen Vu Manh
Professional Certificate for Transport Construction Supervision
Chứng chỉ
hành nghề giám sát thi công xây dựng công trình
Page 11 of 20
Nguyen Vu Manh
Certificate of Cost Estimator
Chứng chỉ
kỹ sư định giá xây dựng
Page 12 of 20
Nguyen Vu Manh
Certificate of Deputy Project Manager
Chứng nhận Phó giám đốc quản lý
dự án
Page 13 of 20
Nguyen Vu Manh
Certificate of Deputy Project Manager
Chứng nhận Phó giám đốc quản lý
dự án
Page 14 of 20
Nguyen Vu Manh
Certificate of Site Manager
Chứng nhận Chỉ huy trưởng
Page 15 of 20
Nguyen Vu Manh
Certificate of Site Manager
Chứng nhận Chỉ huy trưởng
Page 16 of 20
Nguyen Vu Manh
Certificate of Project Manager Skill Training Course
Chứng chỉ
bồi dưỡng nghiệp vụ giám đốc tư vấn quản lý
dự án
Page 17 of 20
Nguyen Vu Manh
Certificate of Procurement Skill Training Course
Chứng chỉ
bồi dưỡng nghiệp vụ đấu thầu
Page 18 of 20
Nguyen Vu Manh
Certificate of Project Management Professional Training Course
Chứng chỉ
bồi dưỡng quản lý
dự án
chuyên nghiệp
Page 19 of 20
Nguyen Vu Manh
Page 20 of 20