Giới thiệu về ứng viên

THE SOCIALIST REPUBLIC OF VIET NAM
Independence – Freedom – Happiness
*****************
CURRICULUM VITAE
-Full name:
Nguyen Thanh Dong (Mr.)
-Add:
27 Vũ Thành Năm Tam Ky City, Quang Nam
Province,
-Handphone:
– Email address:
CAREER

OBJECTIVE
:
I love to work in a friendly and committed professional environment, highly motivated and
enthusiastic.
Have a chance to improve in work and have chances to discover new

projects
to improve
himself,
Good in team work skill and hard work
Try my best to become an excellent manager, and create a friendly, professional international
work environment.
Main project and Work descriptions:
MACE Corp
Year :
From 2010 to 12/2012
Position :
Site Engineer-QC
1- NSG Pilkington Float Glass Factories (in Vung Tau city, VietNam)
+ Site Engineer,supervison pressing pile construction. Currently undertaking the completion
of the supervision of construction, piling and basement excavation has recently been
completed, supervisor road around factory
+ Check and inspect the on -site works:
rebar installation, formworks installing
for pile cap, mass foundation, single foundation.
+ Check and inspect the work for installing steel frame, main frame column
frame, beam frame, roof purlin, eave strut, X-bracing, insulated material,
ventilation device, ridge vent, roof panel, canopy .
+ Implement and monitor brick work, plastering work, tiling work, cladding
work, painting work, waterproofing, façade and landscape.
+ Check BOQ and Interim payment submitted by the Contractor.
+ In- charge of testing:
trial mix, grouting, material test at laboratory and at
plant.
+Responsible for inspecting infrastructure work:
Pipe culvert, Box Culvert,
Road and Pavement.
+Conducting field inspections and producing inspection reports for various construction

activities
.
+ Progressively built and compile the project turnover packages throughout the construction
schedule and maintain the up to date of the quality control records.
+ Control QC/QS of items foundation and finishing factory
+ Meeting with client or the main contractor
2.Project City Garden Binh Thanh District , Ho Chi Minh city
Green City Garden apartment is a luxury apartment with unique design is the highly elliptical
towers of 21-30 floors.
+Calculate, check the quantity of work done and access the Monthly Interim
Payment of the Main contractor.
+ To check and approve the materials to use for the project.
+ To inspect the work carried out by the main contractor, including:
structural
work, finishing work, façade and landscape work.
+ To manage and coordinate all the contractors, subcontractors and other
parties involved on the site for carrying out the work.
3. Imperia An Phu District 2 Hight 26 floors & Project President Place Hight -14 floors
District 1, TpHCM
(in Hochiminh City, Viet Nam)
+ Responsible for supervise quality, quantity and variation order in construction of the
Contractor on the site follow contract condition, specification, working drawing.
+Supervised work items in the construction site such as:
items landscape ,civil works, and all
items relating to finishing building of the Block 102 (Sunflower-26 floors)
+ Supervised safety on site,
+ Planed and created forms for inspection sheet and defect list for all of the flats and items of
works on the site,
+ Planed schedules for each items,
+ Calculate, check the quantity of work done and access the Monthly Interim
Payment of the Main contractor.
+To manage and coordinate all the contractors, subcontractors and other
parties involved on the site for carrying out the work.
+ Control QC/QA
+ Check and inspect the on -site works:
Structure , super-structure and finishing building…
+ Issue NCR or SMM to main contractor
+ Safety is concerned for all

activities
during monitoring
+ Meeting with client or the main contractor
LOTTE E&C –Quang Ngai Province
Year :
From 1/2013 to 5/2015
Position :
QC-QS
Da Nang- Quang Ngai Expressway Development . Package A4
+ Control document & Make inspection sheet and method statement for construction
+ Checking progress, push sub-constructor keep progress, looking for the reason why works
delayed. Document for inspection, as-build document etc..
+ Responsible for supervise quality, quantity and variation order in construction of the
Contractor on the site follow contract condition, specification, working drawing.
+Checked & instructed for the sub-constructor while carry out working drawings, method
statement, variation order, calculation for structural and calculations of quantity.
+ Checking the equipment mobilization to site, quantity & quality of equipment . Testing
experiment & submit material document of steel, sand, stone, water trial mix concrete etc…
+ Checked and monitored the construction contractor’s operation at the scene and do related
work. Prepare weekly, monthly progress report for meeting between contractor, consultant &
employer.
+ Control all volume IPC of contractor checking carefully before submit ower payment
+ Daily progress report, weekly progress, monthy report to manager
+ Meeting with client, engnineer or the sub- contractor
VNT19 PULP MILL RELOCATION –BINH SON –QUANG NGAI
Year :
From 6/2015 to 12/2016
Project :
VNT19 PULP MILL Factory
Position :
QS & QC
+ Responsible for supervise quality, quantity and variation order in construction of the
Contractor on the site follow contract condition, specification, working drawing.
+ Checked & instructed for the sub-constructor while carry out working drawings, method
statement, variation order, calculation for structural and calculations of quantity
+ Check and inspect the work for installing steel frame, main frame column frame,
beam frame, roof purlin, eave strut, X-bracing, insulated material,ventilation device,
ridge vent, roof panel, canopy
+ Review and approval shop drawing, document material submit by contractor
+ Control QC /QA
+ In- charge of testing:
trial mix, grouting, material test at laboratory and at
plant.
+ Check BOQ and Interim payment submitted by the Contractor
+ Control document, drawing, drawing update status
+ Daily progress report, weekly progress report to manager
+ Safety is concerned for all

activities
during monitoring
+Meeting with client or main contractor
Hoa Phat Dung Quat Steel Company
Year :
From 1/2017-to 1/2019
Project :
Hoa Phat Dung Quat Steel
Position :
Team Leader & QC-QS Leader zone :
Coke 1,2- Thermal power
plants
+Site Engineer, safety supervisor, supervison, pressing pile construction. Currently
undertaking the completion of the supervision of construction, piling, install rebar &
formwork….
+ Review & Approval shop drawing, document material… submit by contractor
+ Review& Approval method statement for construction of items structure & fit-out
+ Ensure that the tests, controls and inspections are carried out and that personnel have
access to all required project documentation.
+ Check and inspect the work for installing steel frame, main frame column
frame, beam frame, roof purlin, eave strut, X-bracing, insulated material,ventilation
device, ridge vent, roof panel, canopy.
+ Implement and monitor brick work, plastering work, tiling work, cladding
work, painting work, waterproofing, façade and landscape.
+ Check BOQ and Interim payment submitted by the Contractor.
+ In- charge of testing:
trial mix, grouting, material test at laboratory and at
plant.
+ Monitor refractory performance, and control FC refractory consumption and material
issuing at Coke 1+2
+ Monitoring for casting maintenance and maintenance for refractory concrete all zone at the
factory
+ Monitoring and collect trial mix concrete for maintenance, incident, refractory performance
and production information for analysis and reporting.
+ Checked and monitored the construction contractor’s operation at the scene and do related
work. Prepare weekly, monthly progress report for meeting between contractor, consultant &
employer.
+ Issue NCR or SMM to main contractor
+ Checking progress, push sub-constructor keep progress, looking for the reason why works
delayed. Document for inspection, as-build document etc…
+ Control all QC/QA
+ Control document, drawing, drawing update status
+ Daily progress report, weekly progress report to manager
+ Meeting with client or main contractor
FQM Corp
Year :
From 1/2019 -7/2019
Project :
HoiAnA- Six Star Hotel
Position :
Team Leader
+ Check and inspect the work for installing steel frame, main frame column frame, beam
frame, roof purlin, eave strut, ventilation device, ridge vent, roof panel, canopy.
+ Implement and monitor brick work, plastering work, tiling work, cladding work, painting
work, waterproofing, façade and landscape
+ Site inspecting, quantity survey, review shop drawings, checking payments for contractors,
review work program, control design
+ Review& Approval method statement for construction of items structure & fit-
Supervisor all items finishing building and structure of 2 tower Khos-Hotel & All- Suite
Hotel project
+ Control all items fit-out of VIP Gaming Casino
+ Weekly report and monthy report to owner
+ Checked and monitored the construction contractor’s operation at the scene and do related
work. Prepare weekly, monthly progress report for meeting between contractor, consultant &
employer.
+ Checking progress, push sub-constructor keep progress, looking for the reason why works
delayed. Review and approval Document for inspection, as-build document etc…
+ Issue NCR or SMM to main contractor
+ Meeting with client or main contractor
+ Safety is concerned for all

activities
during monitoring
+ Control document, drawing, drawing update status
+ Daily progress report, weekly progress report to manager
SPECIAL

SKILLS
:
Computer
+ Good at Microsoft Office and other software such as AutoCAD, Photoshop.
,Nova, Hs 2005
+ Training about setting up and installing hardware and software
+ English B
+ Certificate supervisor road and bridge and landscape and building civil expiration date :
3/2023
+ Certificate Safety on site
+ Diploma university , major :
civil engineer
+ Other

Skills
:
– Communication skill
– Professional customer looking-after skill
– Good in team work skill
Regards,
Nguyen Thanh Dong (Mr.)

Hãy là người đầu tiên đánh giá “Nguyen Đông 1985”

Đánh giá của bạn cho danh sách này